|
Processing plant

Our
headquarters are based in Vigo, on the Northwest of Spain.
The
processing and administrative work
are carried out on a 12000 square metres area.
The
lab for Quality Control and R&D is located in
the same building.
Our
storage capacity here is 7000 tonnes.
Port
facilities
Loading
and discharge of bulk liquids in tank vessels, with a
capacity of 4000 tonnes in tanks, fitted with
heating system and direct pipelines to vessels.
This
is located in the bulks area at the Port
of Vigo, a geographically strategic point
within merchant maritime trade.
|